Machine Relocation

Week 1: Machine, loader and automation all relocated successfully. Week 2 and machine no 2 starts today.
         

 

 

         

 

 

         

Week 2: Machine, automation cell and all associated ancillary equipment relocated successfully and handed back to production on time. Week 3 and machine no 3 starts today.

         
   
         
   
         
Week 3: Machine, automation cell and all associated ancillary equipment relocated successfully and handed back to production on time. Week 4 and machines no 4 & 5 began yesterday. These next 2 weeks are particularly challenging as we are relocating 2 machines per week and must return them to production within the same time frame.
         
   
         
   
         
Week 4: 2 x Machines, automation cells, rough stock loader and all associated ancillary equipment relocated to their new locations successfully and handed back to production on time.
Week 5 and machines no 6 & 7 begins today.
         
   
         
   
         
   
         
Week 5: 2 x Machines, automation cells, rough stock loader and all associated ancillary equipment relocated to their new locations successfully and handed back to production on time.
Week 6 and machines no 6,7,8,9,10 & 11 begins today.
         
   
         
   
         
   
         
Week 6: 2 x Machines, automation cells and all associated ancillary equipment relocated to their new locations successfully and handed back to production on time. Whilst our clients facility is in a shutdown period we are also relocating all of the machines extract systems and associated high level extraction ducting.
Week 7 is under way with welfare facilities being relocated, machine commissioning, overhead crane relocations and ancillary equipment moves still on the agenda.
         
   
         
   
         
   
         
       
         
Week 7: All relocated machines and automated loaders are now in position along with all associated oil coolant delivery systems and extraction units. Next week is the final week of this project with all extraction ducting, welfare areas, gauge benches, pallet stands, floor painting of vacated areas, overhead hoist system and final commissioning to be completed ready for handover to our client for full production.
         
   
         

RECENT PROJECTS

MES (NW) project management skills and technical expertise enable us to successfully undertake a wide range of contracts. With Successful Projects in Food, Aerospace, Automotive & Construction we can deliver in all manufacturing sectors.

Machine Relocations

Machine Relocations

 

Production Line Relocation

Production Line Relocation

 

Data Connection
Installation

Data Connection
Installation

Head Office
Hewitt House
Winstanley Road
Orrell
Wigan WN5 7XA
Telephone 01695 682 161
Mail info@mesnw.co.uk

ISOQAR niceic Chas Approved Safe Contractor Approved Northern Automotive Alliance SOCIAL
© Copyright 2021 MES (NW) Limited • Privacy Policy • Site by Heron Marketing & Joolz Design
LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook LinkedIn Facebook